Recent reporting on the Royal Prince Alfred (RPA) Hospital has highlighted the serious consequences that can arise when airborne contaminants are introduced into sensitive healthcare environments during construction works.

While the findings are confronting, they also reinforce something well understood across the industry: managing indoor air quality (IAQ) during hospital construction and refurbishment is both critical and complex.

A complex and often invisible risk

The final report into the RPA incident identified a likely source associated with a balcony area connected to the works, where dust containing fungal spores is believed to have entered the hospital environment.

This is a sobering reminder that in healthcare settings, risks are not always obvious.

Dust generated during construction activities is more than just a nuisance, it can act as a carrier for airborne contaminants, including fungal spores such as Aspergillus. For immunocompromised patients, even low levels of exposure can lead to serious health outcomes.

What makes this particularly challenging is that these risks are often invisible, transient, and highly dependent on airflow pathways within and around the building.

Why hospitals require a different standard

Hospitals are uniquely sensitive environments. Patients, particularly those with weakened immune systems, rely on the built environment to actively protect them from harm.

At the same time, construction and maintenance works are unavoidable. Upgrades, expansions and essential services works must often occur alongside live clinical operations.

This creates a well-recognised tension:
 how to safely deliver construction projects without compromising patient safety.

As broader research into indoor air quality continues to show, airborne risks remain under-recognised and inconsistently managed across many indoor environments . In healthcare settings, the margin for error is significantly smaller.

According to this article from MDPI approximately half of healthcare-associated Aspergillus outbreaks are caused by construction or renovation activities within or around hospitals.

From known risk to managed risk

Importantly, airborne contamination during construction is not a new or unexpected issue. It is a known and manageable risk, provided the right controls are in place.

Best practice approaches typically begin with a baseline risk assessment, identifying areas where dust and airborne contaminants may enter sensitive spaces.

These aren’t always obvious locations. Areas such as balconies, plant interfaces, ceiling voids, and air intake zones are routinely identified as higher-risk pathways, particularly where they intersect with construction activities.

From there, effective management relies on a combination of:

  • Targeted control strategies
     Including dust suppression, physical barriers, pressure management, and cleaning protocols
  • Clear escalation processes
     Ensuring that when risks increase, works can be adjusted or paused
  • Verification through testing
     Such as mould air quality testing to confirm the presence or absence of airborne fungi

The role of continuous monitoring

One of the key shifts in recent years has been the move from periodic checks to continuous IAQ monitoring during construction works.

Often referred to as hospital dust monitoring, this approach uses real-time particulate data as a proxy for airborne contamination risk.

Rather than waiting for issues to emerge, project teams can respond immediately:

  • Caution alerts signal elevated dust levels, prompting additional suppression measures
  • Stop work triggers ensure that sustained high levels are addressed before they escalate

This real-time visibility allows builders, engineers and facility managers to make informed decisions in the moment, reducing the likelihood of contaminants reaching patient areas.

Intermittent sampling, including targeted fungal testing, can then be used to validate conditions and provide further assurance.

A broader shift toward proactive IAQ management

There is a growing recognition, both in healthcare and across the built environment, that indoor air quality needs to be managed more proactively.

Whether driven by evolving ESG expectations, regulatory focus, or a deeper understanding of airborne transmission, the direction is clear: data-driven, continuous oversight of indoor air is becoming the new standard.

Importantly, this shift is not just about compliance. It is about creating environments that are safer, more resilient, and better equipped to protect occupants, particularly those most vulnerable.

As highlighted in recent advocacy work, safe indoor air is increasingly being recognised as fundamental to accessibility and inclusion, especially for people with chronic health conditions .

Supporting safer project delivery

Across Australia, healthcare projects are already adopting these approaches.

Continuous monitoring, combined with risk-based planning and clear response protocols, is helping project teams better manage airborne risks during live construction environments.

For contractors and healthcare operators alike, the focus is not on eliminating construction activity, but on ensuring it can proceed safely, with the right visibility and controls in place.

Looking ahead

The findings from RPA are a reminder of what is at stake, but also of how far the industry has come in understanding and managing these risks.

Airborne contamination during hospital construction is a complex challenge. But it is not an unsolved one.

With the right combination of planning, monitoring and response, it is possible to significantly reduce risk and support safer outcomes for patients, staff, and project teams alike.

And as expectations continue to evolve, proactive indoor air quality management will only become more central to how we deliver healthcare infrastructure safely.